Over the weekend I made the last of the battery connects, hooked up the DC/DC, and started the first charge. My pack voltage started at ~166V (3.2V/cell), and I was tuning the charger to push the pack to ~176-187V (3.4V-3.6V/cell).
The last thing I need to work on before maiden voyage is the instrumentation, which hopefully will be tonight. Pics soon!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment