After correcting a minor setting problem in the Hairball, I fired up the system for a test. The main contactor engaged, and after putting it into gear, I watched the wheels turn faster and faster as I depressed the Hall Effect pedal. It works, and man is it quiet. It looks like Electro's maiden voyage will be tomorrow! Pics and hopefully video of the main event will be posted.
Awesome!
Thursday, July 31, 2008
Wednesday, July 30, 2008
Traction pack... Online
The HV fuse arrived this week, and I proceeded to install it and hook up the rest of the traction pack (again). I measured the potential across the HV+ and HV- posts -> 185VDC. Woo-hoo! Hopefully today I will be connecting the traction pack to the DC/DC and will run a controller test to see if everything comes up okay.
Wednesday, July 23, 2008
Fuse/Charger almost here!
I've been doing more mundane tasks while waiting for my HV fuse and charger to arrive, i.e. putting in carpet. Packages are enroute from the vendor, so stay tuned!
Saturday, July 12, 2008
Cooling system running - Start day approaching!
I filled the cooling system for the Zilla, and fired up the circulation pump for a test. No leaks, and the system seems to be running well!
The list of things now needed for me to drive Electro is getting really short - actually one item. I need a new 500A HV fuse for front battery pack (blew out the first one on a silly mistake - long story). One should be here in a day or so.
The PFC-20 charger is still not here from Manzanita Micro, but I don't need that to drive the car, just to charge the batteries. This also should be here shortly.
The list of things now needed for me to drive Electro is getting really short - actually one item. I need a new 500A HV fuse for front battery pack (blew out the first one on a silly mistake - long story). One should be here in a day or so.
The PFC-20 charger is still not here from Manzanita Micro, but I don't need that to drive the car, just to charge the batteries. This also should be here shortly.
Thursday, July 10, 2008
DC/DC is in
My Belktronix DC/DC converter arrived on 7/4, and I promptly installed it in its space on the driver side wall of the engine compartment. Here is a pic:
After this pic was taken, I also installed a 60A fuse between the DC/DC and the SLI battery, which protects the LV components from any surges.
My new euro bumpers also arrived from RPI Equipped during the week, so I proceeded to put those in as well. Installation was a snap.

Yesterday I connected to the data port on the HB2 with my laptop/Hyperterm connection, and it was alive! When I turned the key to start input, it returned an error code reporting that the traction battery pack being open, which is correct.
My new euro bumpers also arrived from RPI Equipped during the week, so I proceeded to put those in as well. Installation was a snap.
Yesterday I connected to the data port on the HB2 with my laptop/Hyperterm connection, and it was alive! When I turned the key to start input, it returned an error code reporting that the traction battery pack being open, which is correct.
Tuesday, July 1, 2008
Greenwood Auto Show - EV pics
Fun in the sun at the Greenwood Auto Show in Seattle on June 28.
Lots of EVs!
Me with the Zombie-

The core of the White Zombie - the 'Original Siamese 8' - tandem motors. Also note the Z2K on the side - twice the length of my Z1K...

Me with Plasma Boy -
A pic of the Blue Meanie, another Plasma Boy project -
Lots of EVs!
Me with the Zombie-
The core of the White Zombie - the 'Original Siamese 8' - tandem motors. Also note the Z2K on the side - twice the length of my Z1K...
Me with Plasma Boy -
Sunday, June 29, 2008
Zilla wiring/cabling in progress
The Zilla and Hairball have been *mostly* cabled and wired up. I am trying to keep wiring tidy as I go through this process - it can get messy in a hurry. Here is a pic of the Zilla mount:

And here is a picture of the Hairball mount:

The HEPI accelerator has been wired in as well. The only things missing are the key input and start input wires from the keyswitch. Today I also put work in on the Zilla water pump mount - yes, the Zilla is water-cooled. I made a mount shelf for the mini-reservoir and electric pump - picture pending. This mount will also contain the relays for the vaccuum and water pumps, which will also be wired to the key input. Still working on the cooling plumbing for the Zilla, which is about half-done and consists of coolant tubes running in and out of the Zilla. As I understand it, you can run the Zilla without such cooling, but it is recommended for longer life of the component. At the price I paid for the Zilla, I am a BIG fan of longer life for that thing.
I fixed the sheared bolt situation on the motor as well - by removing the lower nut. Still clearance for the cable lug, so I dodged a bullet there! So the motor is officially wired in as well.
This weekend I went with a friend to the Greenwood Auto Show, which reportedly has a pretty big EV contingent, which grows every year. Surprisingly, I met and had a nice chat with John Wayland and got to see his White Zombie EV up close for the first time, along with some other cool EV conversions! Pics forthcoming.
And here is a picture of the Hairball mount:
The HEPI accelerator has been wired in as well. The only things missing are the key input and start input wires from the keyswitch. Today I also put work in on the Zilla water pump mount - yes, the Zilla is water-cooled. I made a mount shelf for the mini-reservoir and electric pump - picture pending. This mount will also contain the relays for the vaccuum and water pumps, which will also be wired to the key input. Still working on the cooling plumbing for the Zilla, which is about half-done and consists of coolant tubes running in and out of the Zilla. As I understand it, you can run the Zilla without such cooling, but it is recommended for longer life of the component. At the price I paid for the Zilla, I am a BIG fan of longer life for that thing.
I fixed the sheared bolt situation on the motor as well - by removing the lower nut. Still clearance for the cable lug, so I dodged a bullet there! So the motor is officially wired in as well.
This weekend I went with a friend to the Greenwood Auto Show, which reportedly has a pretty big EV contingent, which grows every year. Surprisingly, I met and had a nice chat with John Wayland and got to see his White Zombie EV up close for the first time, along with some other cool EV conversions! Pics forthcoming.